This is how I want to load the FW/DW for the next cooldown. Anyone see issues?
I tried to take into account cycle 4 awardees and engineering tasks.
Spaces where a change needs to be made are in bold. The purpose for each filter is noted with a comment with either the GI name or "engineering".
F1 OPEN
F2 BBP5500 --- Sargent, Indriolo
F3 Reading 6.2, tilted, [Remove 18a]--- Engineering
F4 Reading 6.2, flat--- Indriolo, Engineering
F5 N04679 --- Engineering
F6 N07466 --- Encranez, Tsang, Aoki
F7 BP14100 --- Orton/Engineering
F8 Soifer --- Harper
F9 CO2 filter from UT, [remove BP4990] --- engineering
F10 N07053, [remove BP6000] --- Indriolo
F11 N07901, [remove OCLI S] --- Indriolo, Orton
F12 N05340 --- Goto
D1 BP13465
D2 BP6000, [N07053 to FW]
D3 BP6600
D4 N05340
There will be space in CD24 for reinstalling 18a & OCLI S for Rangwala's science. Are there other projects that could be carried over? Of course I am aware that not everything will be scheduled in March, but we can optimize again before shipping.
UPDATE 11/19/15
Only one change was made, adding the tilted Reading 6.2um filter. The wedged washers were made by E. Quigley with a 2.5 degree tilt. Loaded with same side facing out as for the flat reading filter +MgF2 in slot 4.
Subscribe to:
Post Comments (Atom)

No comments:
Post a Comment